|
Avon Construction is fast developing an excellent reputation for the construction of environmentally sensitive projects. In the last 12 months alone, we have undertaken a number of projects for the Environment Agency, many of which have required the use of unorthodox construction techniques and stringent environment controls:-
-
Flood alleviation scheme at Lymington, Hampshire. Reinforced concrete, blockwork, sheet piling works and timber structures.
-
Oak canoe platform on timber piles on the River Medway in East Peckham, Kent
-
Concrete canoe platform on riverbank in Yalding, Kent
-
Rock armour protection to railway embankment on SSSI site River Test at Redbridge, Southampton
|